en suite modernisation here

Messages
8,004
Name
Bazza
Edit My Images
Yes
How it was

View: https://www.youtube.com/watch?v=WZh2TApOCuk


Today men started to rip everything out

cPlxIuH.jpg
 
mid day today
VqodU1N.jpg


At least it show the pipe runs for any future reference
 
Last edited:
GjVokkl.jpg

end filler panel in to fit shower unit, floor battoned to raise floor for waste pipe.

Tomorrow plasterer to start work and new ceiling
 
Last edited:
Are you tiling the floor?
Unstrengthened chip board is not a good substrate.
 
Sf0Slaq.jpg


5E9ZfBk.jpg


knkdAn5.jpg


#42
Grouting done and shower head and towel rail in. Shower panels and new toilet cistern to fit now and also new floor covering

Then for Sue to paint and me to put up the mirror which means moving the shaver light unit up a few mm. mirror now done


they, the previous owners even bodged with the old mirror. To get it to fit they "nibbled" along the long edge
The one in the photo is a bit bigger but by moving the light up a couple of mm it fitted perfectly. An added bonus is we already had this one from when we moved. Just got to get the proper mirror screws and caps now
 
Last edited:
Back
Top