shreds
Slushy
- Messages
- 1,575
- Name
- Ian
- Edit My Images
- No
If you are going lower you need to be aware of the subsoils you have.
Effectively all your walls below ground level facing out, become retaining walls and will need designing to keep the water out.
Retaining walls and 'tanking' of sub floor walls do not come cheap, but you don't want a room that is damp.
If you think armoured cable is expensive, then going down into the ground and doing it properly....better check the bank balance too.
Effectively all your walls below ground level facing out, become retaining walls and will need designing to keep the water out.
Retaining walls and 'tanking' of sub floor walls do not come cheap, but you don't want a room that is damp.
If you think armoured cable is expensive, then going down into the ground and doing it properly....better check the bank balance too.